ASME NQA-1 2008 PDF

Buy ASME NQA Quality Assurance Requirements For Nuclear Facility Applications from SAI Global. ASME NQA-1– (Revision of ASME NQA-1–). Quality. Assurance. Requirements for. Nuclear Facility. Applications. AN AMERICAN NATIONAL. American Society of Mechanical Engineers (ASME) NQA (95 addenda) and editions. The requirements of these documents shall be complied with .

Author: Tauktilar Bagor
Country: Ukraine
Language: English (Spanish)
Genre: Life
Published (Last): 26 June 2009
Pages: 96
PDF File Size: 17.32 Mb
ePub File Size: 19.65 Mb
ISBN: 845-4-99540-752-3
Downloads: 67764
Price: Free* [*Free Regsitration Required]
Uploader: Nam

Cleanness Prior to Installation. If during this evaluation or at any other time, it is determined by the responsible organization that the capabilities of an individual are not in accordance with the qualification requirements specified for the job, that person shall be removed from that activity until such time as the required capability has been demonstrated.

The application of this Part, or portions thereof, shall be invoked by written contracts, policies, procedures, specifications, or other appropriate documents. The extent of application is to be determined by the organization imposing the Standard.

NQA-1 Compliance for Nuclear Power Generation

Test results shall be nqs-1 and their conformance with test requirements and acceptance criteria shall be evaluated. Responsibility for the control of further processing, delivery, installation, or use of nonconforming items shall be designated in writing. These instructions, procedures, or drawings shall define the following, as applicable: From Wikipedia, the free encyclopedia.

The responsible organization shall establish written procedures for the qualification of personnel, and for the aame that only those personnel who meet the requirements are permitted to perform these activities.

The NQA Committee has regularly updated and revised the Standards since the Edition qna-1 issued to improve its utility and value to the nuclear industry.

  BRAVILOR HWA20 PDF

Controls shall provide for identification, documentation, evaluation, segregation when practical, and disposition of nonconforming items, and for notification to affected organizations. Content of the Procurement Documents.

The design input shall be specified to the level of detail necessary to permit the design activities to be carried out in a correct manner and to provide a consistent basis for making design decisions, accomplishing design verification measures, and evaluating design changes. Appropriate verification activities shall be performed nqa-11 the change.

These procedures shall include the responsibilities and authority of the organizations whose functions affect the configuration of the facility including activities such as operations, design, maintenance, construction, licensing, and procurement. Design adequacy shall be verified by individuals other than those who designed the item or computer program.

20008 other than 10 CFR 50 nuclear power plants utilizing this section may establish other commercial grade criteria for the applicable 10 CFR Part facility, per the definitions contained in 10 CFR Part 21 and other applicable regulations. The applicable requirements of this Standard shall apply 20088 dedication activities for acceptance.

The reviewing organization shall have access to pertinent background data or information upon which to base their approval.

Moreover, ASME does not act as a consultant for specific engineering problems or for the general application or understanding of the Standard requirements.

PD ASME NQA/1A Quality Assurance | EHRO-N Portal

Summary Table for Cleanness Classes. The job performance of inspection and test personnel shall be reevaluated at periodic intervals not to exceed 3 years. Nonpermanent records shall be maintained for the identified retention period. Such documents aeme include or be supplemented with appropriate criteria from para. Requirement 13 Handling, Storage, and Shipping. Prerequisites shall include the following, as applicable: Alternate calculations shall use alternate methods to verify correctness of the original calculations or analyses.

  HG 2185 DIN 2004 ACTUALIZATA PDF

PD635 ASME NQA-1-2008/1A-2009 Quality Assurance

Winchester Subcommittee on Assessment and Verification T. To minimize the possible adverse effects of halogens, the chemical requirements for water used on components or systems containing austenitic stainless steel or corrosion-resistant alloy shall be as determined by technical evaluation.

It is the single most important standard for calibration and testing laboratories around the world. Identification markings shall be applied using materials and methods that provide a clear and legible identification and do not degrade the function or service life of the item.

Audit responses shall be evaluated by or for the auditing organization. The nqs-1 code or standard was made available for public review and comment that provides an opportunity for additional public bqa-1 from industry, academia, regulatory agencies, and the public-at-large.

Measuring and test equipment shall be suitably marked, asmee, labeled, or otherwise identified to indicate calibration status and establish traceability to calibration records.

Wipe tests shall be made prior to the application of any preservative film some type of protective film may be required in order to maintain a clean carbon or low-alloy steel surface at Class B level.