Project name: Ilijan Power Plant (Kepco Ilijan Corporation), Project id: Country: Philippines, Location: Province of Batangas, Batangas. Financial Closure. Ilijan CCGT Power Plant Philippines is located at Ilijan, Batangas City, Philippines. Location coordinates are: Latitude= , Longitude. Type: Gas Power Plant; Area: Luzon, Batangas; Kind of Fuel: Natural Gas; Origin of Fuel: Malampaya Gas Field; Power Capacity: 1, MW (6.

Author: Nashicage Akigis
Country: Thailand
Language: English (Spanish)
Genre: Health and Food
Published (Last): 5 July 2007
Pages: 163
PDF File Size: 7.73 Mb
ePub File Size: 7.59 Mb
ISBN: 881-6-30304-895-7
Downloads: 49047
Price: Free* [*Free Regsitration Required]
Uploader: Nikora

Two very significant obstacles had to be overcome to complete the project. The plant has two power blocks, each a 2 x 1 configuration based on the Mitsubishi G gas turbine. Seawater is used for condenser cooling water.

The plant also share common facilities being used by the Sta. The plant entered commercial service on June 5, llijan This is the first G placed into commercial service outside Japan.

Fill in your details below or click an icon to log in: Rotor cooling air is provided with compressor discharge air extracted from the combustor shell.

This air is supplied as the cooling and sealing air for the turbine disks and rotating blades after being externally cooled and filtered. In the G combustor, the basket and transition are known as the combustor swirler assembly and combustor liner, respectively.

San Lorenzo power plant started using liquid fuel gas oil, naptha, condensate for testing and commissioning by late In addition, the site was often visited by heavy storms and typhoons that slowed construction and delayed the delivery of equipment and materials.

The water treatment system works in three stages: The power station uses diesel as back-up fuel. Email required Address never made public. Each unit is composed of a gas turbine, a steam turbine generator connected to a common shaft and the corresponding heat recovery steam generator. The integrated plant controls are based on the ABB Bailey distributed digital control system. Liquid fuel was used as back-up fuel thereafter.

  CREATING EFFECTIVE TEAMS SUSAN WHEELAN PDF

First G series turbine outside Japan The Mitsubishi G series gas turbines Figure 3 operate with a turbine inlet temperature of 2,F and use steam to cool their combustor liners.

But for Ilijan, the end justified the means. Obstacles overcome Two very significant obstacles had to be overcome to complete the project.

Ilijan, Batangas Powerplant

First G series turbine outside Japan. MCMirant Corp. Commercial operations using natural gas as the primary fuel commenced on January 1, The Mitsubishi G series gas turbines Figure 3 operate with a turbine inlet temperature of 2,F and use steam to cool their combustor liners.

Ground was broken on March 15,with the start of civil construction works. Rita, Batangas City adjacent to Sta. Commercial operation of the power plant was in June 5, Notify me of new comments via email.

The facility is being operated by Siemens Power Corporations, Inc.

Ilijan Combined-Cycle Power Plant – Wikipedia

The plant was operated on liquid ulijan gas oil, naptha, condensate until the end of RSS feed for comments on this post. Obstacles that developers of plants in the U. Entries and comments feeds. Leave a Reply Cancel reply Enter your comment here The G gas turbine uses steam taken from the bottoming cycle for cooling the combustor liner.

Power Gas Markets

The DLN combustor in the MHI G gas turbines consists of a pilot powef, eight main fuel nozzles, air bypass valves, and a double-wall structure for basket and transitions. Rita power plant consists of four 4 units with a plant rated capacity of MW each when operating on liquid fuel By continuing to use this website, you agree to their use. Those figures are remarkable, considering the remoteness of the project and the extensive infrastructure that had to be built to support it see table.

  CAMILLERI UNA LAMA DI LUCE PDF

Each gas turbine generator has a nominal expected gross rated output of MW and MW for each of the turbine generators.

Intermediate steam and primary superheater outlet steam serve as a backup for GT combustor transition piece cooling and are returned to the hot reheat steam. The plant consists of two 2 units with a plant rated capacity of MW each when operating in liquid fuel Ilijan combined-cycle project operational summary Poweer The plant is located at Sta. Cooling circuits for the turbine section are similar to those of the F series.

Power Gas Markets | DOE | Department of Energy Portal

The Ilijan power plant consists of two blocks, each comprising of two gas turbine generators, and one steam turbine generator. Rita power plant to the Calaca substation.

However, the combustor piwer temperatures are different. Rita plant such as the tank farm and fuel jetty, thus reducing the need to duplicate various operational facilities. Direct compressor discharge air is used to cool the first-stage vane, while the compressor bleed air from intermediate stages is used as cooling air for the turbine blade ring cavities and for the second- third- and fourth-stage vanes. You are commenting using your Facebook account.